Whitchurch Village Site Options

A variety of site options for development are set out on the following pages. The options have been prepared in response to the key issues, priorities and objectives set out above. Not all of the site options presented will necessarily be taken forward for allocation for development in the Draft Local Plan. Explanation as to how each of the site options responds to the key issues, priorities and objectives is set out within the opportunities and constraints tables for each site option. Where mitigation or additional evidence work is required to achieve priorities and objectives, this is reference. Conflicts with priorities and objectives are also referenced.

Return to the 'Whitchurch Village' page

The land parcels which make up the site options below have been assessed in more detail in various supporting documents, including the Housing and Economic Land Availability Assessment (HELAA), the Sustainability Appraisal (SA), and the Whitchurch Village Strategic Planning Options Document (SPO).

Following consultation on these site options, a detailed assessment of the transport impact of each site will be undertaken, to inform selection of sites to be included in the Draft Plan. The cumulative impact of all sites included in the Draft Plan will also be assessed. Any site allocations in the Draft Plan will define site specific interventions required.

The Department for Transport has developed a Connectivity Tool that integrates transport and land use data to produce a national measure of connectivity for any location in England and Wales. This tool allows users to filter connectivity scores by local authority, assigning each location a grade from A to J, where A indicates the highest level of connectivity within its local authority area.

Each site option has been evaluated with the Connectivity Tool, and an average grade reflecting its connectivity relative to the Bath and North East Somerset area has been assigned. It's important to note that this assessment is based on the current transport network and existing land uses such as schools and shops, and does not take into account planned or future developments. The grading from A to J is not an overall ranking of site options and in deciding which sites are allocated in the Draft Local Plan other sustainability criteria and deliverability factors will also be considered.

Sustainable growth of Whitchurch Village will need to be unlocked by significant investment in transport infrastructure delivering on projects and mitigation measures outlined in the Creating Sustainable Communities Strategy for Whitchurch Village and referenced in the Transport Opportunities above.

Whitchurch Village Site Options

Select a site to review or comment on the proposed Options

Last updated 1/10/25